GXG Remodeling handles full bathroom remodels and shower conversions for homeowners across Homestead, Leisure City, Florida City, Princeton, Naranja, and every other city we serve in South Miami-Dade, coordinating tile, fixtures, vanities and plumbing connections as one project.
A bathroom is the most unforgiving room in the house to remodel. Water, tile, plumbing and electrical all meet in a small space, and a mistake behind the wall can stay hidden for months. This page is written to answer what homeowners actually worry about: what it costs, how long it takes, whether it needs a permit, and how to keep the new shower from leaking.


These ranges are general industry ballparks, shown for education only, not a GXG quote. Every project is custom, so your real price comes from a free estimate.
These are estimates, not a quote, and prices vary with materials, the season and the scope of the work. See our full bathroom remodel cost guide, or call (786) 724-5571 for pricing specific to your project.
Labor is commonly estimated at somewhere between 40 and 65 percent of a bathroom budget, which is why the cheapest quote is rarely the cheapest result. Ask for the scope itemized so you can compare quotes line by line: demolition and haul-away, waterproofing, tile, fixtures, glass, plumbing, electrical and permit fees.
The most common bathroom regret is a shower that leaks weeks or months after the job, with mold in the wall and damage to the room next to it. Almost all of those leaks come from waterproofing, not from the tile. Good practice has four parts, and it is worth asking any contractor how they handle each one.
Ask to see how it is done, and get the answer in writing. A shower that is tested before tile is far cheaper than a shower that has to be ripped out later.
The construction itself is usually a few weeks, but the schedule depends on what has to be ordered and inspected. A realistic sequence looks like this:
The three biggest causes of delay are special-order tile or vanities, custom glass that is fabricated only after the shower is measured, and inspections. Homeowners often report projects running longer than first quoted, so ask for the timeline in writing and ask what has to be ordered, and when.
Work that moves or adds plumbing, adds electrical or touches structure typically needs a permit in Miami-Dade County, and permits are pulled by the licensed contractor. Cosmetic updates like a vanity swap or repainting generally do not need one. Unpermitted work can surface at sale, in an insurance claim or in a code complaint, and the usual fix is fines and opening finished walls for inspection. Florida's 2026 owner-occupied permit exemption for small projects does not cover plumbing and electrical work, as we understand it, so we confirm with the local building department first. Many cities and the county have their own rules, so see our local pages for Cutler Bay and Palmetto Bay.
Plumbers in South Florida report that cast iron drain lines in slab homes built from roughly 1970 to 1990 can corrode, and bathrooms can also hide softened subfloor and old supply lines. We cannot know what is behind your walls from a doorway, so we look at the age of the home and the lines we can see, and we flag the likely surprises at the estimate. If something does turn up after demolition, you see the reason and the price before we continue.
Plan on the bathroom being out of service for most of the project. If it is your only one, ask about temporary arrangements before the work starts. Ask how dust and debris will be contained, what hours the crew works, and whether the floors and the path through your home will be protected. A good contractor will answer all of this before the contract is signed.
A permit does not replace condo or HOA approval. Associations often require written approval, proof of insurance, set work hours and elevator or parking reservations, and some restrict noisy work. In a condo, a failed shower can also damage the unit below, so waterproofing matters even more. If you are an owner who lives elsewhere, ask how progress will be documented with photos and updates.
We have local guides for Cutler Bay, Palmetto Bay, Key Largo, Princeton, Naranja, Leisure City and Goulds.
As a general industry ballpark, not a GXG quote, a half-bath refresh typically runs $3,500 to $9,000. A full bath with a tub or shower and vanity usually falls between $8,000 and $22,000, and a primary bath often runs $15,000 to $35,000 and up. Online guides for Miami often quote higher mid-range figures, because they include higher-end tile, glass and layout changes. What moves the price most is whether plumbing moves, the tile and fixture choices, and what is found once the walls are open. See our cost guide or request a free estimate.
For a standard full bathroom with the plumbing staying where it is, it can cover a basic remodel: a new tub or shower surround, vanity, toilet, fixtures, paint and simple tile. It gets tight with premium tile, a custom glass enclosure, a moved drain or repairs found after demolition. A smaller refresh, such as a new vanity, toilet, mirror, lighting and paint, can often be done for much less.
A cosmetic refresh sometimes fits, for example a new vanity and top, toilet, faucet, lighting, mirror and paint in a small bathroom. A full remodel with new tile, a new shower and waterproofing usually does not. The honest way to find out is a written, itemized estimate for your exact bathroom.
A half-bath refresh typically takes about a week. A full bath usually runs 2 to 3 weeks, and a primary bath with a full shower or tub conversion can run 3 to 5 weeks. Special-order tile, custom glass and permit inspections are the most common reasons a schedule stretches, and homeowners often report projects running longer than first quoted. Ask for a written timeline, and ask what is ordered and when.
Work that moves or adds plumbing, adds electrical or changes structure typically requires a permit, and cosmetic updates like a vanity swap or repainting generally do not. Permits are pulled by the licensed contractor, and your city or the county decides the details for your address. We tell you up front whether your project needs one.
As we understand the 2026 law, some small owner-occupied projects under $7,500 may be exempt from certain permits, but plumbing and electrical work are not part of that exemption. Because a bathroom remodel is mostly plumbing and electrical, we confirm with the local building department before starting instead of assuming no permit is needed.
Unpermitted work can surface when you sell, when you file an insurance claim, or when a neighbor or inspector notices. The usual result is a stop on the work, fines and the cost of opening finished walls for inspection. That is the main reason we recommend permitted work wherever a permit applies.
Most leaks trace back to the waterproofing, not the tile: a shower pan, curb or corner that was not sealed properly, or a drain connection that was not tested. Good practice is a continuous waterproof membrane, a pan sloped to the drain, careful curb and niche details, and filling the pan with water to test it before tile goes over it. Ask any contractor how they waterproof and test, and get the answer in writing.
Yes, tub-to-shower conversions are one of the most common calls we get. We handle the demolition, waterproofing, tile, fixtures and glass as one project. The drain location and the floor structure decide how simple it is, and we check both at the estimate.
We coordinate the plumbing connections tied to the remodel as part of the same project, so you are not scheduling a separate plumber around our work. Where a licensed trade is required, we bring them in and keep the schedule in one place.
From a shower conversion to a full gut remodel, we give you a written estimate up front. Call (786) 724-5571 or request a free estimate to get started. Curious what it costs before you call? See our guide to bathroom remodel costs in Homestead, FL. Related work: tile installation, a new vanity countertop, and water damage repair if a leak has already happened.
Our testimonials say
"GXG Remodeling repainted our whole exterior and it held up perfectly through the first rainy season. Clean job site, showed up on time every day."
"We had our kitchen cabinets painted instead of replaced and they look brand new. Saved us thousands and the crew was professional start to finish."
"Fast, honest, and the price matched the written estimate exactly. Would call GXG again for our next project."
"Professional from the first call to the final walkthrough. Our home looks brand new."
"Great communication throughout the whole project and the crew cleaned up every day before leaving."
"Would recommend GXG to anyone in Homestead looking for quality work at a fair price."