Open kitchen with a waterfall-edge island, dark flat-panel cabinets and large-format tile floors in a GXG Remodeling renovation

Kitchen Remodeling in Homestead, FL

GXG Remodeling handles kitchen remodels start to finish for homeowners across Homestead, Leisure City, Florida City, Princeton, Naranja, and every other city we serve in South Miami-Dade, coordinating cabinets, countertops, tile, and layout changes as one project instead of juggling separate contractors for each piece.

A kitchen remodel in South Dade is not quite the same job as one in a newer suburb. Many homes here are concrete block with stucco, the air is humid for most of the year, and the hurricane season shapes when materials arrive.

Kitchen Remodel Cost in Homestead, FL

General Industry Ballpark
$15,000 to $45,000
A general industry ballpark for education, not a GXG quote. Your exact price depends on size, cabinet and countertop choices, and whether the layout changes. Request a free estimate for pricing specific to your kitchen. Every project is custom.
Small (under 100 sq ft) $8,000 to $20,000
Mid-size (100 to 200 sq ft) $18,000 to $40,000
Large (200+ sq ft) $35,000 to $65,000+

These ranges are general industry ballparks, shown for education only, not a GXG quote. Every project is custom, so your real price comes from a free estimate.

These are estimates, not a quote, and prices vary with materials, the season and the scope of the work. See our full kitchen remodel cost guide, or call (786) 724-5571 for pricing specific to your project.

Planning the Layout Before You Pick Finishes

The layout decides most of the budget, so settle it first. Keeping the sink, range and refrigerator where they are keeps the plumbing, gas and electrical rough-in in place and usually keeps the job inside the lower part of the cost range above. Moving them adds plumbing, electrical and often a permit. In a smaller kitchen, a smarter cabinet plan (deeper drawers, a tall pantry cabinet, under-cabinet lighting) is often a better use of the same money.

  • Work triangle and clearancesWalk the path between sink, range and refrigerator, and check that doors and dishwasher can open without blocking each other.
  • IslandsAn island needs room on every side to walk and open drawers. In many older South Dade kitchens it does not fit, and a peninsula can work better.
  • Opening a wallIn a block house, a wall that looks like a partition may carry load. Ask any contractor how they confirm that before demolition, and whether a permit or engineering is needed.

Reface, Repaint or Replace the Cabinets

Cabinets are usually the largest single line in a kitchen budget, so this choice moves the total more than any other. The right answer depends on the condition of the boxes, not on the doors.

RepaintBoxes solid, layout stays, you want a color change
RefaceBoxes solid, you want new doors, drawer fronts and a new look
ReplaceSwollen or soft boxes, layout change, or damaged cabinets

Humidity is the local factor. Particleboard is more vulnerable to moisture than plywood, and once it swells from a leak or steam it does not shrink back. How fast that happens varies a lot with the leak and the home. The practical test is simple: open the sink base, press on the bottom and sides, and look for soft spots, swelling and stains. Where boxes are swollen, refacing only covers the problem (see our cabinet refacing page for when it does make sense), and plywood-core cabinets are worth asking about. Our refacing vs. painting guide has more.

One more thing to know before you decide: replacing cabinets almost always means new countertops, because the old tops are cut to the old layout. Refacing or repainting lets you keep the existing tops. Budget for both when replacing.

Countertops and the Order of Work

A countertop fabricator measures after the cabinets are set and level, then cuts the stone to that measurement. That means the schedule has a built-in gap: the kitchen has cabinets but no tops while the stone is being made. Fabrication after measuring is commonly quoted at one to two weeks, but it varies by shop, material and season, so ask for the date in writing. Pick the slab before the job starts, and confirm the sink and cooktop models are on site so the cutouts match. Material tradeoffs, seams and edges are covered on our countertop installation page.

What a Realistic Kitchen Schedule Looks Like

Refresh (cabinet and countertop update)Typically 1 to 2 weeks
Mid-range (new cabinets, same footprint)Typically 3 to 4 weeks
Full renovation (layout change, permits)Typically 6 to 10 weeks
Cabinets and stone orderingLead times vary by product and season

Order cabinets and stone before demolition starts so the kitchen is not stripped and idle. Hurricane season runs June 1 through November 30, and a storm can pause work and delay deliveries, so ask any contractor what happens to the schedule if that occurs.

Block Houses, Older Homes and Newer Builds

South Dade has a mix. Many older homes, including those rebuilt after Hurricane Andrew, are concrete block with stucco, and some have walls finished over furring strips with plaster or drywall. Newer subdivisions may use different framing and have different panels and wiring. What that means for a kitchen:

  • Block homesAdding outlets or moving a drain can mean opening block or plaster, which is slower than in a wood-frame wall.
  • Slab drainsThe kitchen drain often runs through or under the slab. Keeping the sink where it is avoids cutting the floor.
  • ElectricalOlder panels or wiring may need to be updated when you add circuits for new appliances. A licensed electrician should advise, and ask any contractor to price it as a separate line.
  • Newer homesOften easier to open and re-run. Check your HOA rules before ordering anything.
Kitchen with cabinets along the wall and an island in the foreground
Cabinets along the wall and an island, from a recent GXG kitchen.

Ventilation, Moisture and the Sink Area

Humidity works on a kitchen all year. Steam from cooking and the dishwasher, a slow leak under the sink and an air conditioner that cycles on and off can all keep the cabinet bases damp. When we plan a kitchen we look at the sink and dishwasher area first, and we recommend you do the same before you buy anything:

  • Check the supply lines, drain and shut-off valves under the sink before closing in new cabinets. Replace old lines while the area is open.
  • Seal the countertop edges and cutouts around the sink and dishwasher so water does not reach the cabinet box.
  • Plan the range hood. A hood that vents outside removes grease and moisture; a recirculating hood does not remove moisture. Venting through a block wall or roof is a bigger job than it sounds, so ask how the duct would run and who handles any permit.

If you already see water stains, mold or soft flooring, repair that first. See our water damage repair page.

Permits: What Needs One in Miami-Dade

Miami-Dade County's permit exemptions list kitchen cabinet replacement inside a home in the same configuration, but any related plumbing, ventilation or electrical work needs a permit if it is relocated, reconfigured or altered. The county's list does not name countertops, so confirm a countertop swap with your building department. Structural changes need a permit. The City of Homestead has its own Building Department, while homes in unincorporated areas fall under the county, so rules and fees depend on your address. Unpermitted work can cause trouble when you sell or file an insurance claim. Under Florida Statute 489.126, a contractor who takes an initial payment above 10 percent of the price on residential work must apply for needed permits within 30 days and start within 90 days of permit issue, unless you agree in writing to longer periods, so ask who pulls the permit and when. This is general information, not legal advice; confirm current rules with your building department.

Living Without Your Kitchen

For a full remodel, plan on a temporary kitchen for several weeks. Set up a microwave, a hot plate or slow cooker, and a place to wash dishes. Ask when water, power and gas will be off, how dust will be contained, and what hours the crew works. If you have pets or young children, ask where the work area will be closed off. Budget for takeout.

Questions to Ask Any Contractor

  • Who pulls the permit, under whose license, and can I verify it on myfloridalicense.com?
  • Is the scope itemized: cabinets, countertops, appliances, plumbing, electrical, disposal and permits?
  • What is the payment schedule, and is the final payment tied to my walkthrough sign-off?
  • How are extra items found behind the walls priced and approved, in writing?
  • How will the sink area, venting and electrical be handled in my kind of house?
  • What warranty applies to labor and to materials, in writing?

A lower price that leaves out half of these items is not lower. A written, itemized estimate after someone has stood in your kitchen is the only quote worth comparing.

Related Guides and Local Pages

Cost details are in our kitchen remodel cost guide. For finishes, see tile backsplash installation, flooring installation and flooring costs. If cabinets come out and walls need patching, see drywall repair. For how older homes are handled nearby, see our Palmetto Bay kitchen remodeling page.

What's Included

Cabinets, countertops, and tile, all coordinated under one roof.

Kitchen with a stainless refrigerator, wood-tone upper cabinets and a stone-look countertop in a GXG Remodeling kitchen

We coordinate every trade as one project, so you're not managing separate contractors.

Our Process

  • Free in-home estimate & design consultation
  • Permitting where the scope requires it
  • Demo, plumbing & electrical rough-in
  • Cabinets, countertops & tile installation
  • Final walkthrough before we call it done

Frequently Asked Questions

How much does a kitchen remodel cost in Homestead, FL?

As a general market ballpark, not a GXG quote, kitchen remodels commonly fall between $15,000 and $45,000, depending on size and scope. Small updates (cabinet refresh, countertops) can come in under $20,000; a full gut-and-reconfigure with moved plumbing runs $35,000 and up. See our full cost guide or request a free estimate for pricing specific to your kitchen.

How long does a kitchen remodel take?

A cabinet and countertop refresh typically takes 1 to 2 weeks. A full gut remodel with layout changes usually runs 6 to 10 weeks, depending on scope and material lead times.

Do you handle plumbing and electrical, or just cabinets and finishes?

We coordinate the full project, including plumbing and electrical tied to layout changes, as one team instead of you juggling separate contractors for each trade.

Should I reface my kitchen cabinets or replace them?

Reface or repaint when the boxes are solid and the layout works. Replace when sink or dishwasher base cabinets are swollen or soft, the layout changes, or the boxes are damaged. Replacing cabinets almost always means new countertops too. See our refacing vs. painting guide for the full comparison.

Is $10,000 enough to remodel a kitchen?

For a refresh where the layout and plumbing stay put (refaced or repainted cabinets, a new countertop, backsplash and hardware, current appliances kept), it can be. It is not enough for new cabinets, appliances and flooring together in most kitchens. Our cost guide breaks this down.

Can I move my kitchen sink or stove in a block house?

Often yes, but it costs more than in a wood-frame house and usually needs a permit. Drain lines in a slab home may mean cutting the floor. Ask any contractor to explain where the new drain and vent will run before you sign.

Do I need a permit for a kitchen remodel in Miami-Dade County?

Miami-Dade County's permit exemptions list replacing kitchen cabinets inside a home in the same configuration. Related plumbing, ventilation and electrical work needs a permit if it is relocated, reconfigured or altered, and so does structural work. The county's list does not name countertops separately, so ask your building department about a countertop swap. The City of Homestead has its own Building Department, and rules can differ by address, so we confirm for your address first.

How do I keep a kitchen working during a remodel?

For a refresh, often you can, with a few days of limited use. For a full remodel, plan on a temporary setup elsewhere in the home for several weeks. Ask the contractor on which days the water, power and gas will be off.

Why is my quote higher than the numbers I see online?

Online figures for Miami often assume bigger kitchens and more upgrades. The only fair comparison is itemized quotes for the same scope: cabinets, tops, appliances, permits, disposal and electrical, each listed or excluded.

What happens if I remodel a kitchen without a permit in Florida?

If the work needed a permit, the building department may require you to legalize it after the fact, and fees or penalties may apply. It can also cause problems at sale and with insurance claims. Ask your building department what applies.

Is $30,000 enough for a kitchen remodel?

As a general industry ballpark, not a GXG quote, for many mid-size kitchens (100 to 200 sq ft) with the layout kept, $18,000 to $40,000 suggests it can be. For a large kitchen or a layout change, it often is not. Every project is custom, so your real price comes from a free estimate.

What is the most expensive part of a kitchen remodel?

Cabinets are usually the largest single line. Moving plumbing, gas or walls can add more than any finish choice.

In what order should a kitchen remodel be done?

Measure and select, order long-lead items, permit if needed, demolition, rough-in, inspection, drywall and flooring, cabinets, countertop measure and install, backsplash, final connections and paint, then walkthrough.

Does a range hood have to vent outside?

The Florida Building Code's mechanical provisions require range hoods to discharge outdoors through a smooth, airtight duct with a backdraft damper, with an exception for listed ductless (recirculating) hoods installed per the manufacturer and where other ventilation is provided. A hood that vents outside removes grease and moisture; a recirculating one does not remove moisture. Ask how the duct would run through a block wall or roof.

From a full gut remodel to a cabinet and countertop refresh, we give you a written estimate up front. Call (786) 724-5571 or request a free estimate to get started. See our guide to kitchen remodel costs in Homestead, FL.

Ready to Start?

  • 10+ years of local experience
  • Our guarantee: we don't stop until it's right
  • Licensed & insured

Call now or request a free, no-obligation estimate.

(786) 724-5571 Free Estimate
icon

Our testimonials say

What Homestead Homeowners
Are Saying

★ 5.0 out of 5, based on 10 reviews

GXG Remodeling
GXG Remodeling

Homestead's Trusted Painter & Remodeler

GXG Remodeling serves Homestead and 13 other South Miami-Dade & Upper Keys cities, FL with licensed, insured painting and remodeling work built for South Florida homes.

Contact Us

Call Free Estimate