How Much Does a Kitchen Remodel Cost in Homestead, FL?

Every kitchen remodel quote looks different because every kitchen is different. This guide walks through cost ranges by size and by category, the costs people forget, how long each phase takes, what to know about permits, older South Florida homes, humidity, and hurricane season, and how to compare quotes, so you have a number to plan around before you call anyone.

Typical Cost Range

General Industry Ballpark

$15,000 to $45,000

A cabinet refresh can land under $10,000. A full gut-and-reconfigure with moved plumbing or an addition can run well past $45,000. The ranges below break down why.

Short answer for most homeowners: a refresh with existing cabinet boxes sits at the low end, new cabinets in the same footprint sit in the middle, and anything that moves plumbing, electrical, or walls pushes you toward the top and beyond. The rest of this guide explains where each dollar goes so you can tell a fair quote from an incomplete one.

How This Compares to Published Benchmarks

You will see higher numbers online, and that is not a contradiction. Published figures usually describe a different scope. As typical reported ranges, a Miami-focused remodeling cost guide (remodelwithoutregret.com) puts Miami kitchens at roughly $18,000 to $80,000, and Florida Realtors has cited about $71,159 for a medium and $137,228 for a large kitchen remodel in 2025. Those numbers generally assume larger kitchens, new cabinets, new appliances, and more finish upgrades. The range above reflects typical Homestead-area projects where cabinet boxes may stay, appliances are often reused or excluded, and the layout does not change. These are outside benchmarks for context, not GXG quotes. Check the date and scope on any number you rely on.

Cost by Kitchen Size

Square footage sets the ceiling on how much material and labor a job needs, even before you pick a single finish.

Small (under 100 sq ft)$8,000 to $20,000
Mid-size (100 to 200 sq ft)$18,000 to $40,000
Large (200+ sq ft)$35,000 to $65,000+

These ranges are general industry ballparks, shown for education only, not a GXG quote. Every project is custom, so your real price comes from a free estimate.

Homeowners in online discussions keep asking for a real number with dimensions attached, and they are right to. A 10 by 10 kitchen and a 12 by 12 kitchen can differ by several thousand dollars in cabinets and countertops alone. Give any contractor your measurements, your current cabinet condition, and which appliances stay.

Cost by Category

Here's roughly where the budget goes on a mid-range kitchen remodel, most expensive first.

Cabinets (reface, paint, or replace)$2,500 to $18,000
Countertops$2,000 to $8,000
Appliances (if replacing)$1,500 to $10,000
Flooring$1,200 to $5,000
Backsplash$600 to $2,000
Plumbing & electrical work$800 to $5,000+

These are general ranges, not a quote. Material choice, and whether plumbing or electrical has to move, swing each line item a lot. Cabinet refacing or painting instead of full replacement is the single biggest lever on the total. One thing to know: replacing cabinets almost always means new countertops, while refacing or painting lets you keep the existing tops. For countertops, one Miami quartz pricing guide reports about $60 to $120 per square foot installed, a typical reported range that varies by slab and edge. See countertop installation for material tradeoffs.

The Three Remodel Tiers

Refresh

Cabinet refacing or repainting, new hardware, a new countertop, and a backsplash. The cabinet boxes stay, so there's no demo and no permit delay.

Mid-Range

New cabinets in the same footprint, new countertops, new tile, updated lighting and plumbing fixtures. Layout doesn't move, so plumbing and electrical rough-in stay put.

Full Renovation

Layout changes, moved plumbing or electrical, sometimes a knocked-down wall. This is where permits, inspections, and a longer timeline come in.

Costs People Forget

Final price above the quote is one of the most common complaints homeowners report about remodeling. Most of the gap comes from items that were never in the number. Ask every contractor whether each of these is included, excluded, or an allowance:

  • Demolition, debris haul-away, and dumpster fees
  • Permit fees and any engineering or drawings, where the scope needs them
  • Appliances, plus the install, vent hood, and any gas or electrical changes they need
  • Countertop extras: edge profile, sink and cooktop cutouts, backsplash slab, plumbing disconnect and reconnect
  • Electrical upgrades: added circuits, outlets to current code, lighting
  • Drywall repair, texture, and paint after cabinets come out
  • Flooring that has to be patched or extended under new cabinets
  • Temporary kitchen costs: takeout, a hot plate setup, dishwashing elsewhere
  • A contingency for surprises behind walls; 10 to 20 percent is a common rule of thumb in the industry, not a legal or GXG standard

What Actually Drives the Price

Cabinets are usually the single biggest line item. Refacing or painting existing boxes costs a fraction of new custom cabinetry. After that, in order of impact:

  • Countertop material: laminate, quartz, and granite all price differently
  • Whether plumbing or electrical has to move
  • Tile backsplash and flooring scope
  • Appliance package: keeping existing appliances vs. new ones
  • Access and logistics: condo elevators, long carry distances, and HOA work windows

South Florida Specifics

A few local factors change both price and schedule here compared with national averages:

  • Older concrete block (CBS) homes: many South Dade homes are block construction. Walls may be finished over furring strips, and running new plumbing or electrical can mean opening block or plaster, which is slower and costlier than in a wood-frame house. Ask your contractor how they would handle it before you sign.
  • Humidity: moisture and salt air are hard on some finishes. Ask about moisture-rated or sealed materials, cabinet boxes that tolerate humidity, and proper ventilation over the range.
  • Hurricane season: it runs June 1 through November 30, and a storm can pause work and stress supply chains. Ask about lead times on cabinets and stone and what happens to a stalled schedule.
  • HOA and condo rules: many associations require written approval, certificates of insurance, set working hours, and freight elevator bookings. Start that paperwork early, since approvals can take days or weeks.
  • Post-Andrew and older wiring or panels: depending on the home, an electrical panel or wiring update may be recommended when you add circuits. Have a licensed electrician advise.

Our Palmetto Bay kitchen remodeling page covers how older homes there are handled, and our kitchen remodeling page shows the work we do around Homestead.

Permits in Miami-Dade County

Cosmetic changes, like refacing or painting cabinets, a new countertop, or a backsplash, typically don't require a permit. Moving plumbing, electrical, or gas lines, or changing the kitchen's layout, does under Miami-Dade County code, and inspections add time to the schedule. Rules differ between unincorporated Miami-Dade and incorporated cities with their own building departments, so confirm with the department that covers your address. We handle the permitting process for jobs that require it, and we'll tell you upfront whether yours does.

Why this matters to you: unpermitted work can complicate insurance claims and resale. Under Florida Statute 489.126, a contractor who takes an initial payment of more than 10 percent of the price on residential work must apply for required permits within 30 days and begin work within 90 days of permit issuance, unless you agree in writing to longer. This is general information, not legal advice. When comparing quotes, ask who pulls the permit, under whose license, and verify the license on the state's Department of Business and Professional Regulation lookup.

Timeline by Phase

Total time depends on scope: a refresh usually takes 1-2 weeks, a mid-range remodel 3-4 weeks, and a full renovation with permitted work 6-10 weeks. A typical sequence looks like this, though each project differs:

1. Estimate, design, and selectionsDays to a few weeks
2. Permit review, if requiredVaries by city or county
3. Ordering cabinets and stoneLead times vary by product and season
4. Demolition and rough-inDays
5. Inspections, drywall, flooringDays to a week or more
6. Cabinets, then countertop template and installFabrication often takes about a week or more after template
7. Backsplash, fixtures, paint, punch listDays

The slowest step is often waiting for materials, not the work itself. Ask what is already ordered before demolition starts so your kitchen is not stripped and idle. The countertop template cannot happen until cabinets are set and level.

How to Compare Quotes

Two quotes with a $10,000 gap are rarely for the same job. Line them up like this:

  • Is the scope written in detail: cabinet brand or line, countertop material and edge, flooring, fixtures, paint?
  • Are demolition, disposal, permits, and cleanup listed or excluded?
  • Which items are allowances, and what happens if you pick something pricier?
  • Who pulls permits, and what license number is on the contract? Verify it on the state lookup.
  • Is proof of liability insurance and workers' compensation available on request?
  • What is the payment schedule, and is the final payment tied to your walkthrough sign-off? Be cautious of large deposits.
  • How are change orders priced and approved, in writing?
  • What warranty applies to labor and to materials, in writing?
  • What is the start date, expected duration, and plan if a storm or a backorder hits?

A lower price that leaves out half of those items is not lower. A written, itemized estimate after a site visit is the only quote worth comparing.

Does It Pay Off at Resale?

Kitchens are consistently one of the better-recouping remodels at resale, though the return depends on how the finished kitchen compares to what buyers expect at your home's price point. Remodeling magazine's annual Cost vs. Value report has generally shown smaller kitchen updates recouping a larger share of their cost than major, high-end remodels, but the figures change every year and are national, so check the current report rather than relying on a number here. A kitchen that's wildly nicer than the rest of the house, or one that's clearly dated next to updated homes on the same street, both cap the payoff. The safest bet is a kitchen that matches the quality level of the rest of your home, and one you will enjoy living in.

Frequently Asked Questions

How much does a kitchen remodel cost in Homestead, FL?

As a general market ballpark, not a GXG quote, kitchen remodels commonly fall between $15,000 and $45,000, depending on cabinet scope, countertop material, and whether the layout changes. A cabinet refresh can come in under $10,000; a full gut-and-reconfigure with moved plumbing runs higher. Published benchmarks for Miami and Florida run higher than that range, usually because they assume new cabinets, new appliances, and bigger kitchens.

What is the most expensive part of a kitchen remodel?

Cabinets, almost always. They typically eat 30-40% of the total budget, whether you reface, repaint, or replace them entirely. Countertops, appliances, and any plumbing or electrical relocation are usually the next-largest line items.

Is $10,000 enough to renovate a kitchen?

Yes, for a refresh in a small or average kitchen if the layout and plumbing stay put: refacing or repainting the existing cabinets, a new countertop, backsplash, and hardware, and keeping your current appliances. It is not enough for new cabinets, new appliances, and new flooring together in most kitchens.

Is $30,000 enough for a kitchen remodel?

For many Homestead-area kitchens it covers a mid-range remodel with new cabinets in the same footprint, new countertops, tile, and fixtures. It gets tight with premium appliances, a layout change, or surprises behind the walls, which is why a contingency matters.

What is the 30% rule in remodeling?

Different sources use the phrase differently. The version most often quoted for kitchens is that cabinets take roughly 30% or more of the budget. A second version, a rule of thumb for spending, says to keep a remodel within a set share of your home's value. Treat both as sanity checks, not as a substitute for a written estimate.

How long does a kitchen remodel take?

A refresh-tier remodel usually wraps in 1-2 weeks. A mid-range remodel with new cabinets typically runs 3-4 weeks. A full renovation with a layout change or moved plumbing can take 6-10 weeks once permitting is factored in. Cabinet and countertop lead times can add to the front end.

Do I need a permit to renovate a kitchen in Florida?

It depends on scope and on your city or county. Cosmetic work like refacing cabinets, painting, or swapping a countertop typically does not require a permit. Moving plumbing or electrical, changing the layout, or touching a structural wall generally does. Always confirm with your local building department, and ask any contractor who pulls the permit and under whose license.

In what order should you do a kitchen remodel?

A common order is: plan and measure, order long-lead items, demolition, any structural, plumbing, and electrical rough-in, inspections where required, drywall, flooring, cabinets, countertop template and installation, backsplash, final plumbing and electrical connections, paint and touch-ups, then the final walkthrough.

What should you not do in a kitchen remodel?

Do not pay a large deposit without a written scope, do not start demolition before cabinets and countertops are ordered, do not skip a contingency, do not choose finishes after work begins, and do not hire anyone who will not put the price, scope, and schedule in writing.

Does a kitchen remodel increase home value?

Generally yes. Kitchen remodels are consistently among the better-recouping home improvements at resale, though the exact return depends on how the finished kitchen compares to the rest of the house and to what South Florida buyers expect in your price range. Smaller scopes have tended to recoup a higher share of their cost than very large ones.

How much does it cost to replace countertops in Miami-Dade?

One Miami quartz pricing guide reports roughly $60 to $120 per square foot installed, which puts a typical 40 to 50 square foot kitchen at about $2,400 to $6,000. Treat that as a typical reported range, not a quote, and see our countertop installation page for material options.

National cost calculators are built on national material and labor averages. They don't know your kitchen's layout, your cabinets' condition, or Miami-Dade permitting requirements. The only estimate worth planning around is one written after someone has actually stood in your kitchen. See our kitchen remodeling work or call (786) 724-5571 for a written, no-obligation estimate.

Related guides: flooring installation cost and tile installation.

Category:

icon

Our testimonials say

What Homestead Homeowners
Are Saying

★ 5.0 out of 5, based on 10 reviews

GXG Remodeling
GXG Remodeling

Homestead's Trusted Painter & Remodeler

GXG Remodeling serves Homestead and 13 other South Miami-Dade & Upper Keys cities, FL with licensed, insured painting and remodeling work built for South Florida homes.

Contact Us

Call Free Estimate